Top 10 Banking Institution
Secaucus, NJ
| Tier: | 3 |
| PUE: | 1.65 |
| IT Plug Load: | Scalable up to MW |
Created a CFD model of 16,000 sq. ft. Data Center. Utilizing the model, we verified cooling capacity and remediated hot spots. The entire site energy usage was reduced by 35% with the reduction of setpoints and replacement of inefficient CRAC units.